Rejected Submissions
Your EAc1 modeling doesn't match the envelope spec.
LEED reviewers return 34% of first submissions with deficiency notices. The most common cause: energy models that don't reflect the as-built mechanical schedule.
LEED Consulting Practice
From mechanical schedules and envelope specs to the precise credit language LEED reviewers actually approve — we shepherd buildings to certification.
42 / 60 credits · Platinum threshold
The Problem
Rejected Submissions
LEED reviewers return 34% of first submissions with deficiency notices. The most common cause: energy models that don't reflect the as-built mechanical schedule.
Misunderstood Credits
Three-quarters of teams pursuing Location & Transportation credits leave points on the table by mis-scoping the transit access radius.
Wasted Modeling Hours
Switching from ASHRAE 90.1-2016 to 2019 after schematic design resets your whole performance comparison. We catch this in week one.
The Process

Documentation Timeline
We build a LEED schedule that runs parallel to your construction admin — so documentation happens when the evidence exists, not six months after closeout.

Energy Model Snapshot
Our engineers run EnergyPlus simulations calibrated to your actual mechanical schedules. Not generic templates.

Daylight Simulation
We produce spatial daylight autonomy reports using Radiance — the simulation engine LEED reviewers trust — with full glazing specs from your architectural drawings.
Certified Projects

Denver, CO · Class A Office
485,000 sq ft

Austin, TX · Higher Education
210,000 sq ft

Chicago, IL · Multitenant Retail + Residential
320,000 sq ft

Seattle, WA · Office Retrofit
640,000 sq ft
Credits Documented
Across 60+ projects
First-Submission Rate
vs. 66% industry avg.
Avg. Score Improvement
Over client projections
Sq Ft Certified
Office, campus, retail
Start Here
Four questions. We'll tell you exactly where your project stands and which credits are within reach — no commitment required.
Diagnostic Form
Free Resource
42 items your project team should verify before submitting to GBCI. Covers documentation, modeling baselines, and prerequisite confirmations.
Why teams choose Certify